- New Meetinghouse Standard Plan Releases
Added Tuesday, March 16 2021
New releases of all active meetinghouse standard plans are available, including Granger 250 Meetinghouse, Granger 250 Stake Center, Granger 300 Meetinghouse, and Heritage 17 Stake Center. Updated meetinghouse specifications for these plans are also available in a single zip file. - Updated US & Canada Standard Plans Planning Brochure
Added Wednesday, March 10 2021
The Standard Plans Planning Brochure for the United States and Canada has been updated. - Seminary Standard Plan Release
Added Tuesday, July 7 2020
Release 2020-1 for 1, 2, 3, 4, 6, and 8 classroom seminary buildings have been released. Please see the Seminary & Institute Standard Plans and the S&I Release Summary pages for details. - Seminary Standard Plan Release
Added Monday, July 1 2019
Release 2019-1 for 1, 2, 3, 4, 6, and 8 classroom seminary buildings have been released. Please see the Seminary & Institute Standard Plans and the S&I Release Summary pages for details. - Structural Evaluation Report Templates
Added Friday, April 26 2019
All structural evaluation report templates have been replaced with two new templates, to be found on the Design Guidelines page. - Updated Storage Unit Drawings
Added Thursday, September 6 2018
Updated civil detail sheets for storage buildings for meetinghouse and seminary/institute project have been posted on the Site Civil Resources page. All three available types have been combined into one file. - Seminary Standard Plan Release
Added Friday, August 3 2018
Release 2018-1 for 1, 2, 3, and 4 classroom seminary buildings have been released. Please see the Seminary & Institute Standard Plans and the S&I Release Summary pages for details. - April 2018 Specifications Release
Added Wednesday, April 25 2018
An April 2018 release of all specifications is now available, including New Meetinghouse, Seminary & Institute, O&M, R&I, and Welfare. - Updated Mechanical/Electrical Model for Heritage 17T
Added Wednesday, April 25 2018
Both Revit and PDF downloads for the Heritage 17 Stake Center now include updated mechanical and electrical drawings. See Standard Plan Release Notice #2018-02 for details. - Granger Standard Plan, Release 5
Added Tuesday, April 24 2018
Release 5 of the Granger Standard Plan, available as Granger 250 Meetinghouse, Granger 250 Stake Center, and Granger 300 Meetinghouse, have been posted. See Standard Plan Release Notice #2018-02 for details about what was changed. - Updated Interior Design Documents
Added Friday, April 13 2018
Pre-set Interior Color Scheme Schedule, and Fabric and Product Samples Directory for New Construction and Replacement projects have been updated. - Updated Offline Meetinghouse Capacity Calculator
Added Thursday, April 12 2018
The offline version of the Meetinghouse Capacity Calculator has been updated. - Updated Structural Evalusation Report Templates
Added Friday, April 6 2018
Each of the Structural Evaluation Report Templates available on the Design Guidelines page have been updated. - Updated US & Canada Standard Plans Planning Brochure
Added Thursday, December 21 2017
The Standard Plans Planning Brochure for the United States and Canada has been updated. - Seminary & Institute Standard Plan Release
Added Friday, June 30 2017
Release 10 for 1, 2, 3, 4, 6, and 8 classroom seminary buildings have been released. Please see the Seminary & Institute Standard Plans and the S&I Release Summary pages for details. - Ridge Vent Specifications
Added Thursday, June 29 2017
Updated specifications have been released for section 07 7226 for ridge vents. This affects all specifications, but no other specification updates have been released at this time. - Design Guidelines, Supplemental Documents
Added Friday, March 24 2017
Updates to the Architectural, Civil, and Landscaping Site Development Checklist, as well as the abbreviated and extended versions of the Structural Analysis, Design, Drawing, and Construction Checklists have been posted. - Updated Pre-Set Interior Color Scheme Schedule
Added Thursday, January 19 2017
The Pre-set Interior Color Scheme Schedule has been updated. - Site Civil Resources
Added Thursday, December 8 2016
Civil detail sheets have been updated for Meetinghouse, Seminary and Institute, and Welfare projects. - Updated Interior Design Documents
Added Monday, December 5 2016
Pre-set Interior Color Scheme Schedule, and Fabric and Product Samples Directory for New Construction and Replacement projects have been updated. - SPC M16-0683 Misc. Structural Revisions to Heritage 09T
Added Thursday, December 1 2016
Please see Standard Plan Change (SPC) Notice #M16-0672 for information about miscellaneous corrections made to the HER09T Meetinghouse and Stake Center structural drawings. Heritage 09T Meetinghouse and Stake Center drawings have been updated to include the corrections. - Heritage 09T, Release 7
Added Friday, October 21 2016
Release 7 of the Heritage 09T Meetinghouse, and Stake Center standard plans is now available. See the Standard Plan Release (SPR) Summary, page for a list of modifications. - Independence Phased Meetinghouse, Release 6
Added Thursday, August 11 2016
Release 6 of the Independence Phased Meetinghouse is available. Please see the Standard Plan Release (SPR) Summary for each plan type for a detailed list of what has changed. - SPC M16-0672 Miscellaneous HER09T Structural Corrections
Added Tuesday, July 26 2016
Please see Standard Plan Change (SPC) Notice #M16-0672 for additional corrections to miscellaneous information in the HER09T Meetinghouse and Stake Center structural drawings. - AV Technology and Acoustical Consultants for US & Canada
Added Thursday, July 14 2016
AEC's list of approved acoustical and audiovisual consulting firms for meetinghouse projects has been updated. - SPC-M16-0670 Heritage 09T Release 6 Structural Drawing Changes
Added Tuesday, July 12 2016
Please see Standard Plan Change (SPC) Notice #M16-0670 for corrections to miscellaneous information in the HER09T Meetinghouse and Stake Center structural drawings. - Design Guidelines, Supplemental Documents
Added Thursday, June 16 2016
Asphalt, Site Concrete and Pervious Concrete Maintenance Guidelines, has been updated. - SPC-M16-0655 Heritage 09T Entrance Framing, Beam Elevations
Added Friday, June 10 2016
Please see Standard Plan Change (SPC) Notice #M16-0655 for details about further changes to details and beam elevations at main entrances. - Seminary & Institute Planning Brochure
Added Tuesday, May 31 2016
An updated planning brochure with 2016 Standard Plans for US & Canada Seminaries & Institutes of Religion has been released. - Design Guidelines, Supplemental Documents
Added Tuesday, May 10 2016
A new document, titled Asphalt, Site Concrete and Pervious Concrete Maintenance Guidelines, has been added to replace "Asphalt Paving Maintenance Strategy and Preservation Guidelines." - SPC-M16-0645 Heritage 09T Entrance Framing, Beam Elevations, and Truss Hurricane Ties
Added Friday, May 6 2016
Please see Standard Plan Change (SPC) Notice #M16-0645 for details about changes to details and beam elevations at main entrances. - Seminary & Institute Standard Plan Release
Added Tuesday, April 19 2016
Release 9 for 1, 2, 3, 4, 6, and 8 classroom seminary buildings, and release 10 for 2 and 3 classroom institute buildings have been released. Please see the Seminary & Institute Standard Plans and the S&I Release Summary pages for details. - Electrical Drawings Removed from Heritage 09T Stake Center
Added Friday, April 8 2016
A few electrical drawings that were no longer needed have beeen removed from the Heritage 09T Stake Center standard plan. - SPC-M16-0628 Nursery Room Chalkboards
Added Friday, March 25 2016
Please see Standard Plan Change (SPC) Notice #M16-0628 for details about changes to nursery room chalkboards. - Meetinghouse Standard Plan Committee (MSPC) Notification #9
Added Tuesday, March 15 2016
A new Meetinghouse Standard Plan Committee (MSPC) notification has been added regarding fluorescent lamp color, musical instruments in meetinghouses, and new meetinghouse video distribution system qualification guidelines. - Design Guidelines, Supplemental Documents
Added Tuesday, March 15 2016
A new document, titled New Meetinghouse Video Distribution System Qualifications Guidelines, has been added. - Updated US & Canada Standard Plans Planning Brochure
Added Wednesday, March 9 2016
The Standard Plans Planning Brochure for the United States and Canada has been updated. - Site Civil Resources
Added Thursday, February 25 2016
Civil detail sheets have been updated for Meetinghouse, Seminary and Institute, and Welfare projects. - Heritage 09T, Release 6
Added Wednesday, February 24 2016
Release 6 of the Heritage 09T Meetinghouse, and Stake Center standard plans is now available. See the Standard Plan Release (SPR) Summary, page for a list of modifications. - February 2016 Specifications Release
Added Tuesday, February 23 2016
A February 2016 release of all specifications is now available, including New Meetinghouse, Seminary & Institute, O&M, R&I, and Welfare. All specification documents have been converted to the newer .docx format. - Updated Civil and Structual Testing and Inspection Services Guidelines
Added Thursday, February 18 2016
Civil and Structural Testing and Inspection Services Guidelines have been updated. - Updated Pavilion Drawings
Added Thursday, February 4 2016
All pavilion drawings have been updated with some minor revisions. - Site Civil Resources
Added Thursday, December 17 2015
Civil detail sheets have been updated for Meetinghouse, Seminary and Institute, and Welfare projects. - Design Guidelines, Supplemental Documents
Added Thursday, December 17 2015
The Geotechnical Evaluation Report Template has been updated. - Independence Phased Meetinghouse, Release 5
Added Tuesday, December 15 2015
Release 5 of the Independence Phased Meetinghouse had to be pulled from the website in late November for some additional updates. It is now available for download once again. - Site Civil Resources
Added Tuesday, December 8 2015
Civil detail sheets have been updated for Meetinghouse, Seminary and Institute, and Welfare projects. These sheets are also now available for Bishops Storehouse projects. - Heritage 98, Release 20, Sound Sheets Update
Added Thursday, December 3 2015
Sheets related to the sound system have been updated in the Heritage 98 standard plan. - Updated Interior Design Documents
Added Wednesday, December 2 2015
Pre-set Interior Color Scheme Schedule, and Fabric and Product Samples Directory for New Construction and Replacement projects have been updated. - Independence Phased Meetinghouse, Release 5
Added Friday, November 20 2015
Release 5 of the Independence Phased Meetinghouse is available. Please see the Standard Plan Release (SPR) Summary for a detailed list of what has changed. - Design Guidelines, Supplemental Documents
Added Tuesday, November 17 2015
The Geotechnical Evaluation Report Template has been updated. - Sample Asphalt Paving Maintenance Record, Design Guidelines
Added Thursday, October 29 2015
A Sample Asphalt Paving Maintance Record has been added to the supplemental documents section of the Design Guidelines page. - Design Guidelines
Added Wednesday, October 28 2015
Some minor changes have been made to landscaping charts in the Design Guidelines for United States and Canada. - Design Guidelines, Supplemental Documents
Added Tuesday, October 27 2015
Asphalt Paving Maintenance Stategy and Preservation Guidelines has been updated. - Design Guidelines, Supplemental Documents
Added Tuesday, September 22 2015
The Geotechnical Evaluation Report Template has been updated. - Site Civil Resources
Added Friday, September 18 2015
Civil detail sheets have been updated for Meetinghouse, Seminary and Institute, and Deseret Industries projects. - Updated Interior Design Documents
Added Thursday, July 23 2015
Pre-set Interior Color Scheme Schedule, and Fabric and Product Samples Directory for New Construction and Replacement projects have been updated. - Heritage 14T Meetinghouse, Stake Center, and Stake Addition
Added Tuesday, July 14 2015
Heritage 14T standard plans have been released. PDF and DWG versions are available from the Heritage 14T Meetinghouse and Stake Center pages. See the Standard Plan Release (SPR) Summary for a list of modifications. - Site Civil Resources
Added Tuesday, July 7 2015
Civil detail sheets have been updated for Meetinghouse, Seminary and Institute projects. Standard details are also now available for Deseret Industries projects. - Updated Common Landscape Detail Sheets
Added Tuesday, July 7 2015
Sheets L501 through L505, which contain general and specific irrigation and planting details for all standard plans, have been updated. See the Landscape Resources page to download the latest version in either PDF or DWG. - Landscape: Water Conservation Guidelines
Added Wednesday, June 17 2015
A new Water Conservation Guidelines document has been added to the Landscape Resources Page. - Site Civil Resources
Added Wednesday, June 17 2015
Civil sheets C500 through C509 have been updated. On sheet C501, the note for exterior concrete has been expanded to be more clear about the type of concrete to use in certain conditions. - Landscape: Water Thought for the Month
Added Tuesday, May 26 2015
Some thoughts regarding water usage have been added to the Landscape Meetinghouse Update section of the Landscape Resources page. - Updated Interior Design Documents
Added Monday, April 20 2015
Pre-set Interior Color Scheme Schedule, and Fabric and Product Samples Directory for New Construction and Replacement projects have been updated. - Design Guidelines, Supplemental Documents
Added Wednesday, March 18 2015
Several supplemental documents that were previous offered in both PDF and Word formats are now in Word format only. - Design Guidelines, Supplemental Documents
Added Monday, March 16 2015
Asphalt Paving Maintenance Stategy and Preservation Guidelines, and Asphalt Maintenance Checklists for Facilities Manager and Contractor have been updated. - Meetinghouse Standard Plan Committee (MSPC) Notification #8
Added Wednesday, March 4 2015
A new Meetinghouse Standard Plan Committee (MSPC) notification has been added regarding digital video systems for new construction and replacement projects. - Design Guidelines, Supplemental Documents
Added Wednesday, February 25 2015
Asphalt Paving Maintenance Stategy and Preservation Guidelines have been updated. - Design Guidelines, Supplemental Documents
Added Thursday, February 12 2015
The Structural Investigation Report Template has been updated. - Design Guidelines, Supplemental Documents
Added Wednesday, February 11 2015
The Geotechnical Evaluation Report Template has been updated. - Design Guidelines, Supplemental Documents
Added Tuesday, February 10 2015
Abbreviated and extended versions of the Structural Analysis, Design, Drawing, and Construction Checklists documents are available. - Design Guidelines, Supplemental Documents
Added Wednesday, February 4 2015
Abbreviated and extended versions of the Civil Analysis, Design, Drawing, and Construction Checklists documents are available. - Updated US & Canada Standard Plans Planning Brochure
Added Tuesday, February 3 2015
The Standard Plans Planning Brochure for the United States and Canada has been updated. Style options previously shown in a separate Heritage 09T style selection brochure are now combined in this document. - SPC M15-0008 Heritage 09T Truss "Mark" Corrections and Detail Corrections at Overbuilds
Added Tuesday, January 20 2015
Several truss member "marks" need correction. Two associated overbuild details also need correction. Please see Standard Plan Change (SPC) Notice #M15-0008 and attached drawings for details. - SPC M15-0007 Video Distribution System
Added Friday, January 16 2015
Standard Definition (SD) Analog video systems have been replaced with High Definition (HD) Digital video systems. Please see Standard Plan Change (SPC) Notice #M15-0007 for details. - Updated Fabric and Product Samples Directory
Added Friday, January 16 2015
Updates have been posted to the fabric and product samples directories for new construction and replacement projects. - Updated Landscape Drawings
Added Monday, December 15 2014
Additional prototypical landscape drawings have been added to the Landscape Resources page for two and six classroom seminaries in eco-regions 6.0, 10.1, and 10.2. - Balanced Chapel / Teaching Areas
Added Monday, December 15 2014
An updated Balanced Chapel / Teaching Area Chart is available. - Standard Light Fixture Schedule - Updated
Added Thursday, December 11 2014
The standard light fixture schedule has been updated. - Minor Specifications Update
Added Friday, November 7 2014
Revised specifications have been posted for sections 01-4523, 03-2100, and 03-3111. All project types are affected. - Updated Pavilion Drawings
Added Friday, November 7 2014
All pavilion drawings have been updated with some minor revisions. - Design Guidelines, Supplemental Documents
Added Thursday, November 6 2014
The Architectural, Civil, and Landscaping Site Development Checklist has been updated. - SPC A14-0006 Interior Concrete Slab Reinforcing
Added Friday, October 31 2014
High Volume Synthetic Fiber Reinforcing (HVSF) is no longer to be used for interior slabs in meetinghouse projects. Please see Standard Plan Change (SPC) Notice #A14-0006 for details. - Heritage 98, Release 20
Added Wednesday, October 22 2014
The Heritage 98 meetinghouse standard plan has been updated to release 20. PDF and DWG versions of the updated plans are available from the Heritage 98 Meetinghouse page. See the Standard Plan Release (SPR) Summary for a list of modifications. - Updated "Approved Worldwide Standard Plans"
Added Thursday, October 2 2014
The Approved Worldwide Standard Plans document has been updated. - New Supplemental Document
Added Thursday, October 2 2014
A new Structural Investigation Report Template has been added to the Design Guidelines Supplemental Documents list. - Updated Supplemental Documents
Added Tuesday, September 9 2014
The following documents on the Design Guidelines Supplemental Documents list have been updated: Geotechnical Evaluation Report Template, Checklist, and Sample. - Design Guidelines, Supplemental Documents
Added Tuesday, September 9 2014
The following documents have been added to the Design Guidelines Supplemental Documents list: Sample Geotechnical Evaluation Report, Architectural, Civil, and Landscaping Site Development Checklist. - Design Guidelines, Supplemental Documents
Added Tuesday, August 5 2014
Login is no longer required for supplemental documents listed on the Design Guidelines page. Several supplemental documents have been updated with minor revisions. - Standard Plans Change Boundaries
Added Tuesday, August 5 2014
The Standard Plan Change Boundaries document has been updated. - Geotechnical Consultant and Testing Agency Agreement Instructions
Added Wednesday, July 9 2014
A new supplemental document has been added to the Design Guidelines page: Geotechnical Consultant and Testing Agency Agreement Instructions for Administrative Assistants and Service Providers - Updated Documents
Added Monday, July 7 2014
The Structural Evaluation Report Template for meetinghouses in the United States has been updated. An updated version of the Sample Agreement Between Client and Survey Consultant for Boundary and Topographical Survey (U.S.) is also available. - Meetinghouse Standard Plan Committee (MSPC) Notification #7
Added Wednesday, June 4 2014
A new Meetinghouse Standard Plan Committee (MSPC) notification has been added. Items discussed in this update include meetinghouse artwork, corridor paver tile, pews versus opera chairs on rostrums, LED replacement lamps, tritium exit signs, asphalt maintenance, and geotechnical and civil/structural materials testing and inspection. - Updated Offline Meetinghouse Capacity Calculator
Added Wednesday, June 4 2014
The offline version of the Meetinghouse Capacity Calculator has been updated. - Updated Interior Color Scheme Schedule
Added Friday, May 30 2014
The Pre-set Interior Color Scheme Schedule has been updated. - Heritage 09T, Release 5
Added Tuesday, April 1 2014
Release 5 of the Heritage 09T Meetinghouse, and Stake Center standard plans is now available. See the Standard Plan Release (SPR) Summary, page for a list of modifications. The Stake Center Addition will be available in a few weeks. - Site Civil Resources
Added Friday, March 7 2014
Civil sheets C700 through C801 have been updated, and can be downloaded from the Site Civil Resources page. - Meetinghouse Standard Plan Committee (MSPC) Notification #6
Added Wednesday, February 26 2014
A new Meetinghouse Standard Plan Committee (MSPC) notification has been added with information about a change to the AEC Design Guidelines document to include guidelines for historic properties. - December 2013 Specifications Release
Added Friday, January 10 2014
A December 2013 release of all specifications is now available, including New Meetinghouse, Seminary & Institute, O&M, R&I, and Welfare. Please see the change summary for further information. - Updated Fabric and Product Samples Directory
Added Friday, January 10 2014
Updates have been posted to the fabric and product samples directories for new construction and replacement projects. - Update to Design Guidelines
Added Wednesday, January 8 2014
The Design Guidelines document has been updated. - Site Civil Resources
Added Friday, January 3 2014
Civil sheets C700 through C801 have been updated, and can be downloaded from the Site Civil Resources page. - Updated Structural Evaluation Report Templates
Added Thursday, December 6 2012
Structural Evaluation Report Templates for Meetinghouse (U.S.), Meetinghouse (Canada), Seminaries and Institutes (U.S.), Welfare Facilities (Immediate Occupancy) (U.S.), and Welfare Facilities (Life Safety) (U.S.) have been updated. - Updated Fabric and Product Samples Directory
Added Tuesday, November 27 2012
Updates have been posted to the fabric and product samples directories for new construction and replacement projects. - Sustainable Design - LEED Certification Helps
Added Tuesday, November 26 2013
AEC offers technical assistance in the form of position papers to help with the process of achieving LEED certification. Please visit the new Sustainable Design page for further information. - Meetinghouse Standard Plan Committee (MSPC) Notifications
Added Friday, October 25 2013
A new page with notification documents summarizing decisions from the Meetinghouse Standard Plan Committee (MSPC) has been added. - Site Adapt Design Guidelines - Updated
Added Wednesday, October 23 2013
The Site Adapt Design Guidelines document has been updated. - Standard Light Fixture Schedule - Updated
Added Monday, October 14 2013
The standard light fixture schedule has been updated. - Updated Interior Design Documents
Added Wednesday, October 9 2013
The following documents have been updated: Pre-set Interior Color Scheme Schedule, Fabric and Product Samples Directory for New Construction and Replacement projects. - Update to Design Guidelines
Added Tuesday, October 8 2013
The Design Guidelines document has been updated. - Seminaries and Institutes of Religion
Added Tuesday, September 24 2013
Standard plan drawings for Seminaries and Institutes of Religion have been updated, and two new plan types have been added - a three classroom seminary module (SEM11-HMCS-03-01), and a two classroom institute module (INS11-HMDS-02-01), both for the Heritage 09T Meetinghouse. All plan sets now include sound drawings. Please see the Seminary & Institute Standard Plans page for details. - Updated Landscape Drawings
Added Tuesday, August 20 2013
Prototypical landscape drawings have been updated on the Landscape Resources page. - Updated Geotechnical Evaluation Report Template
Added Tuesday, August 20 2013
The Geotechnical Evaluation Report Template has been updated, and a new Geotechnical Evaluation Report Checklist document has been added to the Design Guidelines page. - Site Civil Resources
Added Wednesday, August 7 2013
Civil sheets C700 through C707 have been updated, and can be downloaded from the Site Civil Resources page. - Updated Fabric and Product Samples Directories
Added Monday, August 5 2013
Vendor directories for fabric and product samples have been updated for both new construction, as well as replacement projects. - Standard Light Fixture Schedule
Added Thursday, August 1 2013
A PDF of a standard light fixture schedule has been added to the home page. - Updated Quality Assessment Materials
Added Tuesday, July 30 2013
The quality assessment checklists have been updated for New Meetinghouse, Seminary & Institute, and Replacement & Improvement projects. Zip files containing all QA materials have also been refreshed. - SPI #78 - Updated Carpet Samples
Added Monday, July 15 2013
A notice regarding changes to meetinghouse carpet contracts, and the distribution of new carpet samples, has been released. Please refer to SPI #78 for details. - Updated Civil and Structural Checklists
Added Tuesday, July 9 2013
Design and drawing checklists for both abbreviated and extended analysis of civil and structural systems have been updated.
PDF and editable Word documents are available for all four checklists on the Design Guidelines page. - SPC M13-0072 IND Prestige with Redlink Thermostat System
Added Tuesday, June 11 2013
The Prestige with Redlink thermostat system has now replaced the T7350 with WebStat thermostat system in all new Independence Phased Meetinghouse standard plans. Please see Standard Plan Change (SPC) Notice #M13-0072 for details. - Updated Standard Plans Change Boundaries Document
Added Monday, June 10 2013
Some minor corrections have been made to the Standard Plans Change Boundaries document. - Updated US & Canada Standard Plans Planning Brochure
Added Friday, May 31 2013
The Standard Plans Planning Brochure for the United States and Canada has been updated. - Updated Common Landscape Detail Sheets
Added Friday, May 31 2013
Sheets L501 through L505, which contain general and specific irrigation and planting details for all standard plans, have been updated. See the Landscape Resources page to download the latest version in either PDF or DWG. - Updated Standard Plans Change Boundaries Document
Added Friday, May 24 2013
An updated version of the Standard Plans Change Boundaries document has been posted. - SPC 12-035 - Organ Speaker Chamber Modifications
Added Friday, May 17 2013
Roof structure bearing elevation information has been added to structural drawings for Heritage 09T meetinghouse and stake centers. Please see Standard Plan Change (SPC) Notice #M13-0066 for details. All Heritage 09T drawings on the AEC website have been updated with these changes. - Heritage 09T, Release 4
Added Friday, May 3 2013
All Heritage 09T downloads have been refreshed to include a minor update to ET, TA, and TT sheets. If you have recently downloaded any of these plan types, we suggest visiting the Heritage 09T Meetinghouse, Stake Addition, and/or Stake Center pages to obtain the updates. - March 2013 Specifications Release
Added Tuesday, April 16 2013
A March 2013 release of all specifications is now available, including New Meetinghouse, Seminary & Institute, O&M, R&I, and Welfare. Please see the change summary for further information. - Heritage 09T, Release 4
Added Tuesday, April 16 2013
Release 4 of the Heritage 09T Meetinghouse, Stake Addition, and Stake Center standard plans is now available. See the Standard Plan Release (SPR) Summary, page for a list of modifications. - Updated Interior Design Documents
Added Thursday, March 21 2013
The following documents have been updated: Pre-set Interior Color Scheme Schedule, Fabric and Product Samples Directory for New Construction and Replacement projects. - Two New Design Guidelines Supplemental Documents
Added Thursday, March 21 2013
Please see the Design Guidelines page for two new supplemental documents: Civil Analysis, Design, Drawing, and Construction Checklists, and Extended Structural Analysis, Design, and Drawing Checklists. - SPI #77 - Carpet VMR Changes
Added Tuesday, February 19 2013
Changes have been made to carpet VMR processes for O&M/R&I projects. Please refer to SPI #77 for details. - Site Civil Resources
Added Wednesday, December 19 2012
A new Site Civil Resources page has been added, with current standard site details for parking lots, sidewalks, curbs, gutters, driveways, etcetera. Sheets with details for pervious concrete paving, as well as for storage units are also available there. Civil detail sheets downloaded with standard plans are to be considered obsolete, and will be removed from the standard package in future versions. - Updated Civil and Structual Testing and Inspection Services Guidelines
Added Monday, December 10 2012
Attachements A and B have been replaced in the Civil and Structural Testing and Inspection Services Guidelines document. - Seminaries and Institutes of Religion
Added Tuesday, October 23 2012
Standard plan drawings for Seminaries and Institutes of Religion have been updated, and for the first time are now available for authorized download from the AEC website. See the new Seminary & Institute Standard Plans page for details, including PDF and ZIP downloads, and Standard Plan Release (C-SPR) summary documents. - Updated Fabric and Product Samples Directory
Added Tuesday, October 16 2012
Updates have been posted to the Pre-set Interior Color Scheme Schedules, as well as fabric and product samples directories for new construction and replacement projects. - September 2012 Specifications Release
Added Tuesday, October 16 2012
A September 2012 release of all specifications is now available, including New Meetinghouse, Seminary & Institute, O&M, R&I, and Welfare. Please see the change summary for further information. - Updated Quality Assessment Materials
Added Thursday, October 4 2012
The quality assessment form and associated checklists and training materials has been updated for New Meetinghouse, Seminary & Institute, and Replacement & Improvement projects. - SPC 12-035 - Organ Speaker Chamber Modifications
Added Monday, September 10 2012
The front opening to organ speaker chamber 156 on the Heritage 09T standard plan has been enlarged and interior surfaces modified to improve overall acoustical properties. Please see Standard Plan Change (SPC) Notice #12-035 for details. - Updated Landscape Drawings
Added Thursday, June 28 2012
Prototypical landscape drawings have been updated on the Landscape Resources page. - Style & Furnishings Selection Handbook - New SharePoint Site
Added Wednesday, June 20 2012
A newly created SharePoint site now contains the Style & Furnishings Selections Handbook. Accessible to church employees only. See further details in Standard Plan Information Notice #76. - Updated Quality Assessment Materials
Added Wednesday, June 20 2012
The quality assessment form and associated checklists and training materials has been updated for New Meetinghouse, Seminary & Institute, and Replacement & Improvement projects. - Independence Phased Meetinghouse, 300
Added Thursday, June 7 2012
The initial release of the maximum sized (300) meetinghouse and stake center within the Independence series or phased standard plans, is now available. Please see the Standard Plan Release (SPR) Summary for more information. - Updated Standard Plans Change Boundaries Document
Added Friday, June 1 2012
An updated copy of the Standard Plans Change Boundaries document has been posted. - Materials & Furnishings Budget Summary - May 2012 Update
Added Tuesday, May 29 2012
The Materials & Furnishings Budget Summary has been updated with pricing information to be used in preparing the 2012 Annual Plans for DTA Areas within the United States and Canada. - Independence Phased Meetinghouse, Release 4
Added Wednesday, May 18 2011
Release 4 of the Independence Phased Meetinghouse is available. Please see the Standard Plan Release (SPR) Summary for a detailed list of what has changed. - April 2012 Specifications Release
Added Friday, May 11 2012
An April 2012 release of all specifications is now available, including New Meetinghouse, Seminary & Institute, and O&M, R&I, and Welfare. The date of each section's latest change is now shown through a new "Changes" column. - Updated Pavilion Drawings
Added Wednesday, May 9 2012
Drawings for pavilions have been updated. 5 versions that accomodate different structural needs are available. These drawings can be downloaded in PDF, DWG, and Revit formats. - Update to Design Guidelines
Added Thursday, April 12 2012
The Design Guidelines document has been updated. Minor revisions and clarifications have been added to the document including:
A note has been added to Table 4.2 clarifying landscape architect responsibilities with regards to deviations from guidelines.
Clarification is given as to when a Meetinghouse Site Management Plan should be produced.
Emphasis is placed on the need to evaluate life cycle costs when it comes to Replacement and Improvement projects. - February 2012 Specifications Release
Added Friday, March 9 2012
A March 2012 release of all specifications is now available, including New Meetinghouse, Seminary & Institute, and O&M, R&I, and Welfare. The change logs, which were added in the October 2011 release, have now been incorporated into the main list on each page. Sections that have been updated are marked with a green checkmark in the new Δ (Delta - changes) column. - Updated Instructions for Record Drawings
Added Tuesday, March 6 2012
The instructions for submitting record drawings have been updated. - Heritage 09T, Release 3
Added Thursday, March 1 2012
Release 3 of the Heritage 09T Meetinghouse, Stake Addition, and Stake Center standard plans is now available. See the Standard Plan Release (SPR) Summary, page for a list of modifications. - Update to Design Guidelines
Added Wednesday, February 22 2012
The Design Guidelines document has been updated. - Meetinghouse and S&I SPC Documents - Password Protected
Added Tuesday, February 21 2012
Several documents offered on this website require a password in order to help prevent misuse by unauthorized parties. We've noticed several files included with our Standard Plan Change Notices showing up on document reseller websites, and therefore have decided to password protect them as well. Please use the same password distributed for Standard Plans and Specifications to gain access to these resources. - Updated Meetinghouse Planning Brochure
Added Thursday, February 16 2012
The Standard Plans Planning Brochure for Meetinghouses has been updated. - Updated Quality Assessment Materials
Added Tuesday, February 7 2012
The quality assessment form and associated checklists and training materials has been updated for both New Meetinghouse as well as Seminary & Institute projects. A new QA form for Replacement & Improvement Projects has been added. - Sisal Recommended Installation Video
Added Monday, January 23 2012
A video showing recommended installation practices for Sisal wallcovering is available. - SPC: Heritage 98 Furnace F-4 Ductwork Change
Added Thursday, January 5 2012
Standard Plan Change Notice Number 12-001, regarding a change to supply and return air ductwork layouts for Furnace F-4 in the Heritage 98 meetinghouse, has been posted. - Updated Landscape Resources
Added Wednesday, January 18 2012
Plant lists have been added to the Landscape Resources page. Common landscape detail sheets have been updated, and a new landscape meetinghouse update for January is available. - Updated Geotechnical Evaluation Report Guidelines
Added Monday, November 21 2011
Geotechnical Evaluation Report Guidelines has been updated. A new Geotechnical Evaluation Report Template is now available for download from the Design Guidelines page. - C-CPC.13 - Video Storage Cabinet Elimination
Added Monday, November 14 2011
Video (media) storage cabinets have become unnecessary for the seminary program and are now being eliminated from all seminary buildings. See S&I (CES) Standard Plan Change Notification (C-SPC) number 13 for further details. - Independence Phased Meetinghouse, Release 3
Added Tuesday, November 1 2011
Release 3 of the Independence Phased Meetinghouse is available. Please see the Standard Plan Release (SPR) Summary for details what has changed. - October 2011 Specifications Release
Added Wednesday, October 12 2011
An October 2011 release of all specifications is now available, including New Meetinghouse, Seminary & Institute, and O&M, R&I, and Welfare. A new change log, listing which sections have been updated, is now available at the top of each specs page. See also the Standard Plan Release Summary about this update. - Updated AEC Website Design
Added Monday, October 10 2011
The AEC website has been updated with a new look and feel more similar to that of the Church's main website at lds.org. The update includes improved navigation, a new search feature, a new site-wide menu button, and other improvements. The content is the same - we've just changed the way we organize and present it. The password for protected documents has also been changed - contact a project manager, facilities manager, or AEC for the update. This password is needed only when accessing downloads for standard plans and specifications. We welcome your feedback - links to our feedback box are provided at the bottom of each page on the website. - Heritage 09T, Release 2
Added Wednesday, September 28 2011
Release 2 of the Heritage 09T Meetinghouse, Stake Addition, and Stake Center standard plans is now available. See the Standard Plan Release (SPR) Summary, page for a list of modifications. - Updated Quality Assessment Materials
Added Thursday, September 8 2011
Updated versions of the Quality Assessment development checklist, construction checklist, as well as the QA Tool itself, are now available. The complete download for obtaining these has also been refreshed. - SPI#74 - Yamaha Piano Discontinuation
Added Thursday, September 1 2011
Standard Plan Information Notice #74 has been posted with information about the removal of Yamaha pianos from the Selection Record. - Updated VMR Client First Contact Information
Added Monday, August 29 2011
Client First Contact information for Value Managed Relationships has been updated. - SPC: Heritage 09T Trussed Rafter TR-1 Loading Clarification
Added Thursday, July 14 2011
Standard Plan Change Notice Number 11-026, regarding a clarification to design loading information for trussed rafter TR-1, has been posted. - Update to Design Guidelines
Added Friday, July 15 2011
The Design Guidelines document has been updated with significant changes to landscaping information. - SPC: ERV Exhaust Backdraft Damper
Added Thursday, July 14 2011
Standard Plan Change Notice Number 11-025 document has been posted. - Updated: Civil and Structural Testing and Inspection Services Requirements
Added Monday, June 27 2011
An updated copy of the Civil and Structural Testing and Inspection Services Requirements document has been posted. - SPI#73 - Utah Millwork Initiative Modification
Added Monday, June 20 2011
Standard Plan Information Notice #73 has been posted with information about a modification to the Utah Millwork Initiative. - Updated Product Sample, Interior Color Scheme Documents
Added Monday, June 20 2011
Vendor directories for fabric and product samples have been updated for both new construction, as well as replacement projects. The pre-set interior color scheme schedules have also been updated. - Updated Specifications, New Welfare Specifications
Added Wednesday, May 18 2011
A May 2011 release of all specifications is now available, including Meetinghouse, Seminary & Institute, and O&M, R&I. Specifications for Welfare projects (Deseret Industries and Bishops Storehouse) are now available as well. - DWG Downloads Have Returned
Added Wednesday, May 18 2011
Meetinghouse standard plans can once again be downloaded directly from the AEC website. We apologize for the lengthy absence of this feature. Please note that specifications are no longer included in DWG downloads. Specs are now available separately in order to help ensure the latest version is always used. - Updated Technical Specialists and Staff Directory
Added Monday, May 9 2011
The Technical Specialists and Staff Directory pages have been updated to reflect recent changes. - Seminary & Institute Planning Brochure
Added Monday, May 2 2011
A new planning brochure with information about standard plans for Seminary and Institute buildings. - Updated Quality Assessment Materials
Added Monday, April 11 2011
Updated versions of the development checklist, construction checklist, and training materials for Quality Assessments are now available. The complete download for obtaining these has also been refreshed. - SPI#72 - Materials & Furnishings Budget Summary - May 2011 Update
Added Monday, May 2 2011
Standard Plan Information Notice #72 has been posted with an updated Materials & Furnishings Budget Summary. - Updated Vendory Directories, Color Scheme Schedules
Added Monday, April 4 2011
Directories for contacting vendors about product samples on new construction and replacement projects have been updated as of April 4th, 2011. Pre-set Interior Color Scheme Schedules have also been updated. - SPC: Millwork VMR Supplier Change
Added Monday, March 28 2011
A standard plan change notice (SPC) has been issued regarding a change to a millwork VMR supplier. This change applies to both Meetinghouse, Seminary, and Institute buildings. Please view SPC-11-003 from the Meetinghouse SPC page, and C-SPC-12 from the S&I SPC page for further details. - SPC: Asphalt Shingle Updates
Added Friday, March 25 2011
A standard plan change notice (SPC) has been issued regarding asphalt shingle updates. This change applies to both Meetinghouse, Seminary, and Institute buildings. Please view SPC-11-002 from the Meetinghouse SPC page, and C-SPC-11 from the S&I SPC page for further details. - Updated Vendory Directories for Fabric and Product Samples
Added Monday, March 21 2011
Directories for contacting vendors about product samples on new construction and replacement projects have been updated. - Standard Plan Release: Independence Series Phased Meetinghouses and Small Stake Center, Release 2
Added Thursday, March 10 2011
Plans for Independence Series Phased Meetinghouses and Small Stake Center, release 2, are now available. Designs for meetinghouses with chapel sizes of 50, 90, 130, 170 and 230 can be downloaded, as well as a small stake center design with a chapel size of 230, from the Standard Plans page. Please refer to the Standard Plan Release Summary for additional information. - Standard Plan Release: Independence Series Phased Meetinghouses and Small Stake Center
Added Monday, January 31 2011
Plans for Independence Series Phased Meetinghouses and Small Stake Center are now available. Designs for meetinghouses with chapel sizes of 50, 90, 130, 170 and 230 can be downloaded, as well as a small stake center design with a chapel size of 230, from the Standard Plans page. Please refer to the Standard Plan Release Summary for additional information. - SPI #71 - Utah Millwork Initiative Clarification
Added Monday, December 6 2010
Standard Plan Information Notice #71 has been issued with a clarification regarding the Utah Millwork Initiative. - Standard Plan Release - Heritage 09T Meetinghouse
Added Tuesday, November 2 2010
Plans for Heritage 09T (Transverse Cultural Center) Meetinghouse are now available. Sloped roof styles C and D can be downloaded from the Standard Plans page. Please refer to the SPR (Standard Plan Release Summary) for additional information. - SPI #70 - Utah Millwork Initiative
Added Monday, November 1 2010
Standard Plan Information Notice #70 has been issued regarding the Utah Millwork Initiative. - Heritage 98, Release 19
Added Friday, October 22 2010
The Heritage 98 meetinghouse standard plan has been updated to release 19. Please see the Standard Plan Release Summary (SPR) for details. PDF and DWG versions of the updated plans are available from the Meetinghouse Standard Plans page. - SPI #69 - Pre-finished Basketball Standards - Color Change
Added Thursday, September 23 2010
Standard Plan Information Notice #69 has been posted regarding a color change to pre-finished basketball standards. - Standard Plans Planning Brochure - September 2010
Added Thursday, September 23 2010
An updated version of the Standard Plans Planning Brochure for the United States and Canada has been made available. - Updated Specifications
Added Tuesday, September 14 2010
Updated specifications are available for Meetinghouse, O&M, R&I, and Seminary & Institute projects are now available. - Heritage 09T Stake Center Standard Plan
Added Thursday, September 9 2010
The Heritage 09T Stake Center standard plan is now available for use. Styles C and D can be downloaded from the Standard Plans page. Please also review the Standard Plan Release Summary for further information about this release. Updated specifications are included in the downloadable file for each of these plans. - Minor Update to Design Guidelines
Added Monday, August 23 2010
The Design Guidelines document has been updated to reflect a recently posted, separate document outlining Standard Plan Change Boundaries. A link is provided to that document, rather than a summary of that information within the design guidelines. - Seminary & Institute Specifications
Added Thursday, August 12 2010
Specifications for Seminary & Institute projects are now available for download from the AEC website. A password is required. - Update to Quality Assesment Tools for Seminary & Institute
Added Tuesday, August 3 2010
Documents used for performing quality assessments on seminary and institute facilities have been updated. Several minor errors have been corrected in the tool, and items have been added to the Civil and Architectural Construction sections. - SPI 68 - Access Controls Cost Benefit FM Tool
Added Thursday, July 22 2010
A Standard Plan Information Notice has been posted regarding a new Access Controls Cost Benefit Tool for Facilities Managers. - Standard Plan Documents Development Standard
Added Wednesday, June 30 2010
A new guide that provides the outsourcing standard for developing architectural, engineering, and landscape design and documentation for projects and standard plans has been posted. Please see Standard Plan Documents Development Standard. - Updated Standard Plans Change Boundaries Document
Added Wednesday, June 30 2010
An updated copy of the Standard Plans Change Boundaries document has been posted. - Minor Update to O&M, R&I Specifications
Added Tuesday, June 15 2010
An updated version of Division 01 for Maintenance Projects has been posted for the O&M, R&I Specifications. - Updated QA Materials for Seminary & Institute Facilities
Added Tuesday, June 15 2010
Additional qualifications have been added to Architectural Construction item #14. - Revised Quality Assessment Materials
Added Monday, May 3 2010
The following materials, used to perform quality assessments, have been updated with minor revisions and fixes: QA Checklists: Development, Construction, QA Training Materials, All QA Materials, including the QA Form. - Standard Plan Information Notice #67 - Updated Artwork Price List / Worksheet
Added Thursday, April 29 2010
A new SPI has been released with an updated Artwork Price List/Worksheet - SPI#67 - Standard Plan Information Notice #66 - Pre-finished Basketball Equipment
Added Thursday, April 29 2010
A new SPI has been released regarding a recent change to owner-furnished basketball equipment - SPI#66 - New Standard Plan Information (SPI) Notices Available
Added Wednesday, April 28 2010
Two new Meetinghouse Standard Plan Information (SPI) notices have been released:
SPI 64 - Materials & Furnishings Budget Summary – May 2010 Update.
SPI 65 - New On-line Church Facilities Artwork Catalog.
With this update, a new link to the Church Facilities Artwork Catalog has been added to the home page. - US & Canada Standard Plans Planning Brochure
Added Friday, April 23 2010
The planning brochure for standard plans used in the United States and Canada is now available for download. - April Release of Meetinghouse Specifications
Added Friday, April 23 2010
Updated specifications are now available for New Meetinghouse, New Meetinghouse with CES Module, Mission Office Module, and O&M, R&I projects. Please note that O&M, R&I projects have been separated onto their own page, shortening the length of the list of sections and making room for the Mission Office Module column. - New Release of Meetinghouse Standard Plans
Added Friday, April 23 2010
Heritage, Legacy, Fayette, and Sharon standard plans have been updated. Downloads of PDF and AutoCAD versions of these plans are available from the Meetinghouse Standards Plans page. Please review the following Standard Plan Release Summaries for details on what has changed:
Heritage 98, release 18 (Traditional, New England, Classical, Colonial)
Legacy 98, release 19 (Traditional, New England, Classical, Colonial)
Fayette 07-170, release 4
Fayette 07-230, release 4
Sharon 90, release 6
Sharon 130, release 6
- Quality Assessment Tool for S&I Updated
Added Friday, April 9 2010
Documents for perfoming quality assessments on Seminary and Institute facilities have been updated with the following changes:
Revisions of some of the item and verification method wording
Addition of graphics to Architectural Development training slides for items 1 and 5
Removal of Civil Construction item on catch basins
Re-categorization of fire protection items 1 and 2 to mechanical
Minor bug fixes - Technical Specialists Updated
Added Thursday, April 8 2010
The Technical Specialists page has been updated. - Quality Assessment Resources Update
Added Tuesday, March 23 2010
Updated versions of the QA documents and tools have been released, including the QA Development and Construction checklists, QA Training Materials, and the ZIP file containing all QA materials including the QA form. - SPC 09-166 and SPI#62 Published Online
Added Friday, February 19 2010
Two documents that were distributed earlier by email have been added to the site for reference:
SPC 09-166 Update Std Plans Change Boundaries
SPI #62 Folding Partition Procurement Revisions - Rostrum Hand Railing Support Detail
Added Monday, February 8 2010
Legacy, Heritage and Fayette standard plans have been refreshed to include an updated rostrum hand railing support detail. This affects the DWG and PDF packages that are downloadable from the site. - Updated Design Guidelines, Technical Specialists, VMR First Contacts
Added Thursday, February 4 2010
A February 1st 2010 release of the Design Guidelines has been posted.
The Technical Specialist list, and the VMR Client First Contacts pages were also updated. - December 2009 Standard Plan Release
Added Wednesday, January 6 2010
New versions of the following meetinghouse standard plans have been released:
Heritage 98, release 17
Legacy 98, release 18
Fayette 07-170, release 3
Fayette 07-230, release 3
Sharon 90, release 5
Sharon 130, release 5
Plans can be downloaded in PDF, DWF, and DWG format from the Standard Plans page of the AEC website. Standard Plan Release (SPR) Summaries are also available on the SPR page. - December 2009 Specifications Update
Added Wednesday, January 6 2010
Specifications for New Meetinghouse, New Meetinghouse w/ CES Module, and O&M, R&I for Meetinghouse projects have been updated. - Updated QA Materials for Seminaries and Institutes
Added Thursday, December 10 2009
Quality Assessment materials for seminary and institute buildings have been updated. - Standard Plans Change Boundaries
Added Thursday, December 10 2009
The Standard Plan Change Boundaries document is now available. - Design Guidelines Update
Added Thursday, December 10 2009
The Design Guidelines document has been updated. - New Training Page
Added Tuesday, December 8 2009
Information regarding training courses that are available can now be found on the new Training page. You can enroll in upcoming courses, or view/listen to training that has been previously recorded. - Updated Quality Assessment Materials
Added Friday, November 13 2009
The tools needed to perform a quality assessment have been revised and updated. Tools for quality assessment on seminary and institute projects are also now available. - Updated Design Guidelines
Added Friday, October 30 2009
An updated version of the AEC Design Guidelines document has been released. - Updated Quality Assessment Materials
Added Tuesday, October 20 2009
An updated version of the Quality Assessment tool and associated training materials has been released. - SPI #63 - U.S. and Canada Standard Plans Planning Brochure
Added Tuesday, October 13 2009
SPI #63 was released regarding an updated standard plans brochure for meetinghouses in the United States and Canada. - SPC 09-133
Added Thursday, October 1 2009
Standard Plan Change Notice 09-133 was released regarding the use of multiple vendors for HVAC equipment in meetinghouses. - Three New Documents on LDS.org/AEC
Added Monday, September 28 2009
Added the following resources to the home page:
Pre-set Interior Color Scheme Schedules
New Construction Vendor Directory for Fabric and Product Samples
Replacement Projects Vendor Directory for Fabric and Product Samples
- Updated Design Guidelines Document
Added Monday, September 28 2009
An updated version of the Design Guidelines document has been released. A new document titled Qualifying for and Ordering Portable Partitions was added. - Updated Legacy Standard Plan Download - Structural Update
Added Friday, September 25 2009
Downloadable versions of the Legacy meetinghouse standard plans have been updated with a revised structural sheet and revised structural calculations. - SPC 09-125 - Baptismal Font Safety Rail
Added Tuesday, September 22 2009
A new Standard Plan Change (SPC) Notice has been released regarding direction from the Presiding Bishopric to retrofit existing baptismal fonts with glass safety railings. See SPC 09-125 for furthed details. - Specifications Update
Added Friday, September 18 2009
Updated specifications are now available for New Meetinghouse (Heritage, Legacy and Fayette), as well as New Meetinghouse with CES Module projects. - SPC 09-135 - Wireless Microphones
Added Friday, September 11 2009
Standard Plan Change Notice 09-135 was released regarding the approved use of wireless microphones in new stake centers. - SPI #61 - Schedule of Values Update
Added Friday, September 11 2009
Standard Plan Information Notice #61 was released regarding an update to the Physical Facilities Schedule of Values (SOV) form. - SPI #54 - Dinnerware Kit Discontinuation
Added Thursday, September 3 2009
Standard Plan Information Notice #54 was released regarding the discontinuation of stoneware dinnerware kits in New Construction projects. - Updated: Civil and Structural Testing and Inpection Guidelines
Added Thursday, September 3 2009
Civil and Structural Testing and Inpection Guidelines, which were referenced in the Design Guidelines documentation, have been updated. - SPI #59 - Meetinghouse Artwork Guidelines Update
Added Friday, August 21 2009
Standard Plan Information Notice #59 was released regarding an updated version of the "Meetinghouse Artwork Guidelines for Facilities Managers and Project Managers" document. - New/Updated SPI's
Added Friday, August 7 2009
Three Standard Plan Information (SPI) Notices have been published to the website:
SPI #57 - Style & Furnishings Selection Handbook for New Construction - July 2009 Update
SPI #58 - Style & Furnishings Selection Handbook for Replacement Projects - July 2009 Update
SPI #60 - Updated AEC Website - SPI #55 - Volleyball Referee Stands
Added Tuesday, July 21 2009
A new Standard Plan Information Notice has been released regarding volleyball referee stands. - Updated Design Guidelines
Added Monday, July 20 2009
A revised edition of the design guidelines manual has been released. - Updated Heritage and Legacy Standard Plans
Added Wednesday, July 15 2009
Legacy version 98-17 and Heritage version 98-16 standard plans are now available for download from the Standard Plans page. - Updated New Meetinghouse, O&M, R&I Specifications
Added Wednesday, July 15 2009
The July 2009 update of the specifications for New Meetinghouse and O&M, R&I for Meetinghouse is now available. - New AEC Website
Added Wednesday, July 15 2009
Design Guidelines, Standard Plans, Meetinghouse Specifications, Standard Plan Changes, and other technical resources from AEC are now available online at http://lds.org/aec. The site is intended to be a resource to architects, engineers, landscape architects, contractors, subcontractors, VMR manufacturers, suppliers, vendors, and Church field personnel working on Church design, construction, and maintenance projects.
What's New
Updates made to the website are listed here and are also available in an
RSS feed.
(Learn more about RSS)