Standard Meetinghouse Specifications
| Last Updated: October 2025 | 2025-New-Space-Specifications.zip |
|---|
O&M, R&I Specifications
(Deferred Maintenance / Capital Renewal)
For Remodel and Improvement projects (R&I) and Operations and Maintenance projects (O&M), typical New Meetinghouse Specifications should generally be used. When approaching this type of work, there are a few options, depending on the project needs.
- Replace elements or components with an equal product (or)
- Replace elements or components with a new product per available specifications.
The New Meetinghouse Specifications above shall be used for general guidance for current standards. The supplementary specifications found below are for situations not addressed in the new space specifications. Consult with O/M Management for guiding principles for updates and changes and A/E section Engineers and Architects for guidance that is not specifically found in the specifications.
Supplementary Specification Sections
Tech Spec Reference Guide
Available hereAccess and use of this site and any plan, drawing, or other document herein is restricted strictly for uses of the Corporation of the Presiding Bishop of the Church of Jesus Christ of Latter-day Saints. Any copying, distribution, or other use is strictly prohibited except by prior written consent of Intellectual Reserve Inc.